Creating operating periods
Notes: Operating periods can only be used if you have activated the Calendar / valid days add-on ( Enabling or disabling add-ons). You can only create operating periods when using an annual calendar (Selecting a calendar ). |
An operating period refers to the duration of the calendar period.
An operating period divides the calendar into different time slots, for example school holidays, summer, winter. Not only can you specify a valid day at a vehicle journey section, but also an operating period. The number of valid days can be reduced this way.
1. From the Network menu, choose PuT valid days.
The PuT valid days window opens.
2. Make sure that the Operating periods tab has been selected.
3. Click the Create button.
The Create operating period window opens.
4. Enter the desired data (Properties and options of operating periods).
5. Confirm with OK.
The operating period of the valid day is created.