Generating link run times from line run times in a procedure sequence

1.  On the toolbar, click the  Open 'Procedure sequence' window button.

The Procedure sequence window opens.

2.  In the desired position of the procedure sequence, insert the Set link run times from line run times operation of the Miscellaneous category (Setting up and starting the procedure sequence).

3.  Make sure that the inserted operation is marked and click the Edit button in the Operations section.

The Set link run times from line run times window opens.

4.  Make the desired changes.

Element

Description

Weighting

Use the drop-down list to select the type of weighting.

  • Minimum
  • Mean
  • Maximum

If a link is part of more than one time profile, the link run time can be determined from the weighted mean of the run times of all time profiles, from the minimum run time of the time profiles, or from the maximum run time of the time profiles which include this link.

Consider only active time profiles

If the option has been selected, only active time profiles will be taken into account.

Consider only active links

If the option has been selected, only active links will be taken into account.

5.  Execute the procedure (Executing procedures in the procedure sequence).

The link run times are generated.