Carrying out the procedure PuT operating indicators
1. On the toolbar, click Open Procedure sequence.
The Procedure sequence window opens.
2. Add the PuT operating indicators procedure of the PuT analyses category to the desired position in the procedure sequence (Setting up and starting the procedure sequence).
3. Make sure that the inserted operation is marked and click the Edit button in the Operations section.
The PuT Operating Indicators: Parameters window opens.
4. Check the settings and make the desired changes (Parameters for PuT operating indicators calculation).
5. Click the OK button.
The PuT Operating Indicators: Parameters window closes. The settings are applied.
6. Execute the procedure (Executing procedures in the procedure sequence).
During the procedure sequence, the PuT operating indicators are calculated according to the specified order of procedures.