Input and output attributes

Input attributes

Network modeling must meet certain requirements before the simulation-based dynamic assignment can be carried out successfully. For the network (links, (main)links, connectors) the PrT transport systems allowed must be defined. In addition, detailed junction coding is required, i.e. lanes, lane turns and data of node control must be made available.

Other input attributes required can be distinguished as follows and are listed in the respective tables:

  • Input attributes of the car following model (Table 147)
  • Other input attributes for simulation (Table 148)
  • Additional input attributes for node modeling (Table 149)
  • Input attributes for calculating node impedances (Table 151)
  • Time-dependent supply data in time-varying attributes (optional)
Output attributes

Output attributes of simulation-based assignment can be differentiated as follows:

  • Output attributes of assignment
  • Output attributes based on the simulation (Table 154)
  • Path list
  • Assignment statistics

Unlike in simulation, real volumes are determined when demand is distributed across routes (volume balancing). At the end of the assignment, the volumes are listed in the corresponding attributes of the network objects.Table 155 list the output attributes filled with values during SBA.

Object

Attribute

Meaning

Links, (main) turns

Volume PrT [veh](AHPI)

Volume-DSeg [veh](AHPI)

Volume-TSys [veh](AHPI)

Volume on network object

Links, (main) turns

vCur_PrTSys(AP)

vCur-PrTSys-TI(AP, TI)

calculated from SBA length and tCur-PrTSys-TI(AHPI)

Links, (main) turns

t0-PrTSys

Travel time in network without volume, taking SBA length and FIFO t0 functions into account

Links, (main) turns

tCur-PrTSys(AP)

tCur-PrTSys-TI(AP, TI)

Travel times calculated from the FIFO tCur functions that are intersected to the analysis time intervals, weighted by the number of vehicles that have contributed to the measured values.

Links, (main) turns

Impedance-PrTSys(AHPI)

calculated taking travel time TCur_PrTSys(AHPI) into account

Links, (main) turns

Delay-PrTSys-TI(AP, TI)

calculated from t0-PrTSys and travel time tCur-PrTSys

(Main) turns

Delay on from-link and turn-PrTSys(AHPI)

link travel time per To turn, intersected to analysis time intervals and weighted by the number of vehicles that contributed to the measured values, plus travel time on turn

Table 155: Output attributes after assignment

Paths and assignment statistics contain the usual output data per demand segment (paths) or transport system (assignment statistics) that is additionally listed per time interval. Time-interval dependent data output refers to vehicles that have entered the network object during the respective time interval. Path travel times are calculated from the FIFO tCur functions, with FIFO tCur taken into account at the time the vehicles enter the network object. Assignment statistics include default outputs as well as evaluations based on the simulation.