Editing the base version
All scenarios are based on the base version. If you change data in the base version, the modifications made might then no longer match the base version. Then the scenarios become useless. Therefore you should only change the base version to a degree that it does not affect the modifications.
Note: You also have the possibility of saving your edits in a separate version file (Saving interim results of an edit). |
1. Make sure that the desired project is open (Editing basic settings of the project).
2. In the Edit project window, click the Basic settings tab.
3. Click the Edit base version button.
The base version is opened. At the same time, the notification bar Edit base version opens above the network editor.
4. Make your changes to the base version.
5. If necessary, select the Check the modifications and finish option in the notification bar.
On finishing, it will be checked whether the changes can still be made without generating an error.
6. Click the Finish button in the notification bar.
The Edit project window opens again. Now you can make additional changes to the project.