PuT operating indicators: Revenue tab

The revenue indicators (Fundamentals: Calculation of operating costs and fare gains (revenues)) include the following indicators:

Note: You can only calculate cost coverage if you have activated the Line costing calculation add-on ( Enabling or disabling add-ons ).

  • Cost coverage total = revenue total – cost
  • Cost coverage percent = (revenue total / cost) • 100
  • Cost coverage PTripUnlinked = cost coverage total PTripsUnlinked

Element

Description

Calculate

If this option has been selected, the indicators of the revenue calculation are calculated.

Calculate also for territories

If this option has been selected, the indicators are additionally calculated by territory.

Save only for active time profiles

If this option has been selected, the revenue indicators are stored only for active time profiles.

Revenue calculation method

The current selection is displayed. To make changes, go to Calculate > General procedure settings > PuT settings > Revenues, or Network > PuT fares (Selecting the revenue calculation method and the distribution method and PuT operating indicators: Infrastructure cost tab).

Calculate indicators for

The current selection is displayed. You can make changes in the Parameters: PuT operating indicators window (PuT operating indicators: General tab)

Save paths

The current selection is displayed. To make changes, go to Calculate > General procedure settings > PuT settings > Assignment (Settings for saving PuT assignment results).

Selecting the revenue calculation method and the distribution method

1.  Make sure, that the input attributes required by this method have been set.

2.  Open Calculate > General procedure settings > PuT settings > Revenues and follow the steps outlined below:

  • Select the appropriate revenue calculation method.
  • Set the respective revenue calculation parameters (except for fare model).
  • Change the settings accordingly for revenue distribution to path legs.

Revenue calculation

Revenue distribution (Fundamentals: Revenue distribution)

Revenue from fare model

(Revenue calculation using the fare model)

Additionally, the revenue distribution can be modified by the following:

  • Fixed amount per path leg
  • Weight by number of fare points
  • Weight by number of path legs
  • Distribute supplements to transport systems

Fixed revenue per passenger trip

(Revenue calculation using a fixed revenue per PTripUnlinked)

Additionally, the revenue distribution can be modified by the following:

  • Fixed amount per path leg
  • Weight by number of fare points
  • Weight by number of path legs

Revenue per fare point

(Revenue calculation using revenue per fare point)

Additionally, the revenue distribution can be modified by the following:

  • Fixed amount per path leg
  • Weight by number of fare points
  • Weight by number of path legs