Editing the time of the day change

You can change the time for the day change of the block view.

1.  From the View menu, choose Line block editor.

2.  From the Line block editor menu, choose Edit parameters.

The Parameters: Line block view window opens.

3.  Make the desired changes.

Element

Description

Time for day change

This setting determines the time of the line break in the block view. If you set a time > 00:00:00, the blocks are shifted in the display. The operating days can be displayed in a position that differs from the calendar day.

4.  Confirm with OK.

The changes are applied.